Buy America · BABA waiver desk

When a waiver posts, the domestic mill loses the order. Flagcup tells your desk the same day.

Federal agencies publish Made in America, Buy America, and Build America, Buy America waivers when they cannot find a U.S. product. Cities, state DOTs, primes, and domestic manufacturers use Flagcup for a short note: agency, item, proposed or approved, dates, project if named, and the official notice.

Flag of the United States
The flag is shown as a flag — canton in the hoist, not a print, not a button, not on the floor.

Recent official waivers

Public teaser from the Made in America listing. Flagcup never invents projects.

Made in America waiver listings

  • Department of Labor

    Performance Audio Analyzers

    Performance Audio Analyzers

    Project / recipient: DEPT OF LABOR-OASAM-OFC PROC SVCS

    Proposed

    Non-availability · Posted Aug 31, 2026

  • General Services Administration

    DETERMINATION AND FINDINGS FOR AN EXCEPTION TO THE BUY AMERICAN STATUTE BASED UPON NONAVAILABILITY

    AC-201B MMD-UB0181BHP-UL; CU-301 (A&B) MMY-MUB096H1HT9PUL; CU-203 (A&B) MMY-MUB096H1HT9PUL; CU-202 MCY-MUB0368HS2P-UL; CU-101 MMY-MUB096H1HT9PUL; AC-303 MMD-UB0241HP-UL; AHU-201 MMD-UB0601VHN-UL; AHU-302 MMD-UB0301VHN-UL; AC-302 MMD-UB0361HP-UL; AHU-301 MMD-UB0601VHN-UL

    Project / recipient: PUBLIC BUILDINGS SERVICE

    Proposed

    Non-availability · Posted Aug 31, 2026

  • Department of Commerce

    Benchtop EPR Spectrometer

    Benchtop EPR Spectrometer

    Project / recipient: NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY

    Proposed

    Non-availability · Posted Aug 31, 2026

  • Department of Commerce

    Unipolar diffusion aerosol charger

    Unipolar diffusion aerosol charger

    Project / recipient: DEPT OF COMMERCE NIST

    Proposed

    Non-availability · Posted Aug 31, 2026

  • Department of Veterans Affairs

    Mitral Valve Retractors

    Mitral Valve Retractor/Adams Retractor

    Project / recipient: 250-NETWORK CONTRACT OFFICE 10 (36C250)

    Proposed

    Non-availability · Posted Aug 31, 2026

  • Department of Commerce

    145 GHz Photodiode

    145 GHz Photodiode

    Project / recipient: NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY

    Proposed

    Non-availability · Posted Aug 28, 2026

Why waivers matter

A posted waiver is a signal that a federally funded buyer could not source steel, iron, a manufactured product, or a construction material in the United States. If your mill, fabricator, or distributor can make that item, the comment window is the chance to keep the order domestic. If you are a city, DOT, or prime, the same notice tells you what just became legal to buy foreign — and what your competitors will bid.

What the desk note includes

  • Agency and product or item
  • Waiver type: proposed, approved, or denied (and open for comment)
  • Posted date and comment deadline when the notice has one
  • Project or recipient if the listing names it
  • A link to the official Made in America or FHWA notice